Component Manufacturing

Component Manufacturing

Our component manufacturing solution is a flexible option for a builder or general contractor to purchase our high-quality, installation-ready building components and install them using their own onsite labor. We'll translate your designs into a fabrication model that ensures that we panelize exactly to your specifications. We will deliver your components to your site where your team can easily assemble. Navigate through the above graphic to understand more about our component manufacturing process.


We build every project twice: once virtually, once in the real world

Every project starts with a detailed digital fabrication model that drives all aspects of our production process. This phase of the process starts by translating the design model into a 3-D digital twin. We use this model to generate everything from an automated bill of materials, to shop drawings, machine files and digital work instructions.

We enable an easier process for our builders

Once construction begins on site, you will be working directly with your general contractor for the duration of the construction process. Site work time varies by project but for single family homes, expect 3-6 weeks from breaking ground to frame start.

Panelization in our Denver factory

Your project is transmitted digitally to our factory floor for precise fabrication using our unique panelized building system. Factory assembly time can range from a few hours (for a small cottage or ADU) to a few weeks (for a large multi-family project). Our approach collapses your schedule while maintaining quality-it is simply a better way to frame.

Putting the final touches on your project

After Simple Homes framing installation is complete, your contractor will have a dried-in building shell ready to receive exterior and interior finish work.